Dezeen Magazine

Castellbisbal School by MMDM Arquitectes

Castellbisbal School by MMDM Arquitectes

Grey and white blinds create a chequerboard pattern against the facade of this Barcelona school by MMDM Arquitectes.

Castellbisbal School by MMDM Arquitectes

The three-storey Castellbisbal School is located in a town just outside the city, on a site that slopes by approximately seven metres.

Castellbisbal School by MMDM Arquitectes

The monochrome blinds screen three rows of windows across the building’s front elevation.

Castellbisbal School by MMDM Arquitectes

A large courtyard behind this entrance block provides breakout spaces for students between lessons.

Castellbisbal School by MMDM Arquitectes

Children between the ages of 3 and 16 years old are taught at the school, separated within the building into a kindergarten, a primary school and a secondary school.

Castellbisbal School by MMDM Arquitectes

To see a few popular stories about schools, including a Stirling-prize winning academy in south London by Zaha Hadid, click here.

Castellbisbal School by MMDM Arquitectes

Photography is by Eugeni Pons.

Here’s a more detailed description from MMDM Arquitectes:


Nursery – Secondary School. From 3 to 16 years.
C/ Major – C/ del Doctor Llarc. Castellbisbal (Barcelona)

Background source and environmental data:

Castellbisbal is a municipality in the province of Barcelona. It is a town of about 13.000 inhabitats, situated in a geographically rugged area with agricultural tradition that actually has turned into an industrial activity.

Castellbisbal School by MMDM Arquitectes

The demographic progresión of Castellbisbal in recent years has gone hand by hand together to a strong urban growth complemented with the construction of new facilities to meet the demands of the arising population. The kindergarten, lower and high school (3-16 years) is an example of this.

The planned location for the new building is located on the north part of the town, right next to the cementery.

Castellbisbal School by MMDM Arquitectes

The plot limits to the east with Major street and south with Dr. Llarc streets where you can still see the trees of the old faro that occupied the site. It has an area of approximately 10.372,95 m2 and L-shaped geometry with unequal lengths. The main slope goes downhill from eat to west, reaching a maximum height of about 7 meters in between its farthest points.

Castellbisbal School by MMDM Arquitectes

A high voltage line and the minimum distance that must be maintained to the walls of the cemetery are the limits added to the one of the own plot. The concern for the organization of outdoor areas to avoid useless areas, causes a new limit, self-imposed, which reduces even more the scope for action.

Castellbisbal School by MMDM Arquitectes

The disposition of the outdoor areas generates a visual sight without barriers that drown the leisure hours of students.The resulting space is occupied by a building, which out stands at the perimeter of a cloister, emptying the interior space used as a patio.

Castellbisbal School by MMDM Arquitectes

Functional criteria:

The program is divided into three functional levels that appear as the ground level looses height. From the Major Street a unique floor is recognizable as the other levels are below the ground level of the street. This level of organization responds to the desire to minimize earthworks. The new topography is suited to the new uses, as well as to avoid a construction of greater impact.

Castellbisbal School by MMDM Arquitectes

The main entrance to the building is through a large inclined plane that leads to the intermediate level, thus, reduces the vertical routes within the school. This great space will be closed once the students have entered school in the morning, becoming part of the recreational areas of the center.

Castellbisbal School by MMDM Arquitectes

Once the main access is closed, the access to the school will be available through the kindergarten and administration access.

The outdoor spaces are designed to form a continuos stream bottoms to avoid residual spaces. You may move from onte to the other without going through the same point again. The treatment of these areas combine the hard surfaces with benches and green spaces with deciduous trees.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

Compositional criteria:

The building is seen as a compact volume, clear geometry, which avoids the major linear routes to be closed on itself causing an outdoor space in the inside. This space, as well as providing lighting and ventilation, causes visual cross sights from all of its sides while leading as through its slight slope at the courtyard areas.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

The same resource is used in the main access, a slightly inclined plane that guides almost in a natural movement the students into the school. The entrance area is designed combining the hard surfaces with benches and green spaces with deciduous trees.

The realisation of the skin of the building is proposed with lacquered microwaved aluminium sheets. This material achieves an excellent definition of the volume while its stripes softens it to the senses.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

The composition of the facades combined with deployé lacquered aluminium, other metallic which allows us to ignore the position of openings and at the same time protects from solar incidence.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

The west facade is formally resolved with a single opening with ajustable slats to hide modules that a number of different program windows. In opposition to this uniformity large openings that are strategically distributed help to lighten the volume of major proportions.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

Constructions and sustainability:

The project presents a very detailed topographic adaptation to minimize waste excavation and compensate small movements of land.

On a constructive sense prefabricated concrete elements have been used in the structure and in this elements that are used as facade support to the ventilated facade systems of different lacquered aluminium (flat sheets, punched and deployé various sections) to achieve a specific solar control and greater energy efficiency, and to improve acoustics conditions in the center and a reduction in construction waste. There has been an interest to work with local providers and to reduce indirect environmental impacts.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

At the same time different systems are placed to reduce consume: a system of solar panels for hot water, a rainwater collection system for irrigation and toilet cisterns, control systems and lighting low-power sensors with presence, and photoluminescent systems, ventilation system control CO2 sensors, cross ventilation in all rooms, the creation of outdoor spaces and planting deciduous trees to improve the external conditions.

Castellbisbal School by MMDM Arquitectes

Click above for larger image

Client: AYUNTAMIENTO DE CASTELLBISBAL
Site area: 10.372,95 m2
Floor area: 5.313,56 m2
Project: Febrero 2010
Beginning work: Phase 1 (25 march 2010) – Phase 2 (02 august 2010)
Final work: Phase 1 (30 july 2010) – Phase 2 (29 july 2011)
PEC: 6.274.325,20 euros

Architects: mmdm arquitectes s.c.p.
Frans Masana Castanys – Joan Dalmases Martí

Collaborating Architect: Helena Mercader Bonaventura
Structure: Bernúz – Fernández Arquitectes S.L.
Engineering: Terrassa Ingenieros S.L.
Quantity surveyors: Bramons, Sitjà, Bassols i Associats S.L.
Construction: VOPI 4